ADUs in the City of Spokane

These rules apply to lots inside Spokane city limits and are drawn from the current Spokane Municipal Code, Chapter 17C.300. The City of Spokane updated its ADU code to comply with Washington HB 1337, so several older figures are superseded.

Currency of these rules

The ADU chapter (SMC 17C.300) is current as of Ordinance C36696, effective July 11, 2025, and the dimensional standards table (Table 17C.111.205-2) is current as of Ordinance C36810, effective January 18, 2026. The older 2016 figures (a 60 foot front setback, one ADU per lot, and owner-occupancy) are fully superseded and are not published here.

City of Spokane ADU rules at a glance

Before you design, confirm whether your lot can support an ADU under these standards.

RuleCurrent City of Spokane standard
Allowed ADU types Detached and attached ADUs (SMC Chapter 17C.300). A basement conversion is handled under the same chapter.
Maximum ADUs per lot Two per lot in the RA, R1, R2, RMF, and RHD residential zones (SMC 17C.300.100).
Maximum ADU size Up to 1,000 sq ft of floor area, detached or attached (the garage is excluded, and the principal structure must be at least 1,000 sq ft). A basement or attic conversion may exceed the cap. Maximum building footprint is 1,200 sq ft (SMC 17C.300.110(1) and Table 17C.111.205-2).
Maximum height 25 ft, all zones (Table 17C.111.205-2).
Setbacks (detached ADU) Side setback matches the primary structure: 3 ft if the lot is 40 ft wide or less, otherwise 5 ft. Rear setback is 0 ft with an alley, 5 ft without one. A side or rear setback can reduce to 0 ft with a signed neighbor waiver (Table 17C.111.205-2, note 5).
Off-street parking Per SMC Chapter 17C.230. Studio and one-bedroom ADUs require no additional parking, and none is required within one-half mile of a major transit stop (SMC 17C.300.130, HB 1337).
Owner-occupancy Not required, except where the lot also operates a short-term rental under SMC Chapter 17C.316, in which case one unit on the lot must be owner-occupied (SMC 17C.300.110(2)).
Permit A building permit plus a certificate of occupancy from City of Spokane Building Services.

Fees: permit, water and sewer charges, and impact fees

In Washington, the charge people often call a system development charge is the general facilities charge (GFC) for water and sewer, plus the transportation impact fee. For the City of Spokane:

The permit process in the City of Spokane

ADU permitting runs through the City of Spokane Development Services Center, which reviews zoning and building requirements and issues the permits. Our homeowner permit guide walks through what to expect without copying the application form.

City of Spokane permit counter: 3rd Floor, City Hall, 808 West Spokane Falls Boulevard, Spokane, WA 99201. Phone 509.625.6300. Email [email protected].

City of Spokane ADU questions

Do I need a permit to build an ADU in the City of Spokane?
Yes. An ADU requires a building permit and a certificate of occupancy from City of Spokane Building Services, reviewed under Spokane Municipal Code Chapter 17C.300. The builder you are matched with manages the permit process. See our Spokane ADU permits guide.
How many ADUs can I have on one lot in the City of Spokane?
Up to two ADUs per lot in the RA, R1, R2, RMF, and RHD residential zones (SMC 17C.300.100), consistent with Washington HB 1337. The older 2016 one-ADU-per-lot rule is superseded.
How big can an ADU be in the City of Spokane?
An ADU may be up to 1,000 square feet of floor area, with a maximum building footprint of 1,200 square feet and a maximum height of 25 feet (SMC 17C.300.110 and Table 17C.111.205-2). A basement or attic conversion may exceed the 1,000 square foot cap.
Is owner occupancy required for a Spokane ADU?
No, not as a general rule. Owner-occupancy applies only where the lot also operates a short-term rental under SMC Chapter 17C.316, in which case one unit on the lot must be owner-occupied (SMC 17C.300.110(2)).

References and primary sources

Regulatory and fee specifics on this page are cited to the current primary sources below. Confirm any figure against its source for your specific parcel before you rely on it.